Telemetry Operational Control Replacement System

Telemetry Operational Control Replacement System 

Extensive replacement

This project is for the replacement of the existing United Utilities regional telemetry system during the AMP4 (Phase 1) and AMP5 (Phase 2) periods.

Planning advice

Grontmij is providing engineering consultancy services within the planning phase of the telemetry operational control replacement system project.

This is being carried out in conjunction with the United Utilities in-house team and includes: requirements definition and production of the user requirements specification; determination of data to be monitored at each asset type; contributing to the architecture and design of the proposed system particularly managing the delivery and review of the relevant documents, assistance with the definition of the business implementation aspects of the project, and leading the outstation migration team.